Kitchen in progress...

The new garden window; a view from outside.

Evidence of a window to the back porch. Vinyl floor torn out, ceiling tiles gone.

The plethora of wall surfaces we encountered. Notice the pink peeking out before the last couple of runs of beadboard were installed? That was sparkly linoleum.

Newly covered with beadboard.
The loss of lower cabinets for the sake of a dishwasher- well worth it. And the loss of upper cabinets because of a necessary new structural support beam- not really missed.

New blueboard with plaster skim-coat. New structural support beam. New recessed lighting. New crown molding and plate rail.

Another upper cabinet gone. Not a loss, really. It was impossible to reach without a ladder, an awkward size, and it made an already tight spot even more claustrophobic. (The cabinet was above the doorway to the entry- the one on the left. The doorway on the right is to the dining room.

The never ending tower of drawers waiting to be sanded, primed, and painted.

More to come...
No comments:
Post a Comment